Asset Report

Minor Fields

Get this report

$2,300

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

02 February 2017

Minor Fields

Report summary

These fields are all small in size end either remote from infrastructure, require expensive recovery techniques to increase production or have limited remaining recoverable reserves. The fields are all operated by private sector companies under a service contract. Petroamazonas pays a stipulated variable operating cost for base production. The majority of the production is gathered at the Lago Agrio station, where it is mixed with crude from other fields and piped to the Pacific Coast via the OCP or the SOTE pipelines.

Table of contents

    • Block 2
    • Block 46
    • Block 47
    • Block 49
    • Block 64
    • Block 65
    • Block 66
    • Block 67
  • Participation and reserves
  • Production

Tables and charts

This report includes 2 images and tables including:

  • Participation and reserves: Table 1
  • Production: Table 1

What's included

This report contains:

  • Document

    Minor Fields

    PDF 193.67 KB

  • Document

    Minor Fields

    XLS 110.50 KB

  • Document

    Minor Fields

    ZIP 257.74 KB

Other reports you may be interested in

Browse reports by Industry Sector