Asset report

Minor Fields

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

These fields are all small in size end either remote from infrastructure, require expensive recovery techniques to increase production or have limited remaining recoverable reserves. The fields are all operated by private sector companies under a service contract. Petroamazonas pays a stipulated variable operating cost for base production. The majority of the production is gathered at the Lago Agrio station, where it is mixed with crude from other fields and piped to the Pacific Coast via the OCP or the SOTE pipelines.

What's included

This report contains

  • Document

    Minor Fields

    PDF 273.78 KB

  • Document

    Minor Fields

    XLS 110.50 KB

  • Document

    Minor Fields

    ZIP 346.34 KB

Table of contents

    • Block 2
    • Block 46
    • Block 47
    • Block 49
    • Block 64
    • Block 65
    • Block 66
    • Block 67
  • Participation and reserves
  • Production

Tables and charts

This report includes 2 images and tables including:

Tables

  • Participation and reserves: Table 1
  • Production: Table 1

You may be interested in

Asset report

Petrocedeno (Sincor)

Asset report

Junin 6

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898