MonArb Area
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- North Cayley development plan delayed
- Development drilling on Montrose hub to prolong production
- Third party tie-backs offer upside potential
- Emissions reductions requirements
- Arbroath
- Montrose
- Future infill drilling
- Arbroath
- Arkwright
- Brechin
- Wood
- Godwin
- Cayley
- Shaw
- Capital costs
- Montrose
- Arbroath
- 18 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Pipeline summaryCapital Costs Pre-2017 to 2024 (US$ million)Capital Costs Pre-2017 to 2025 (US$ million)
-
Capital Costs Pre-2017 to 2024 (US$ million)Capital Costs 2012 to 2016 (US$ million)Capital Costs 2008 to 2017 (US$ million)Capital Costs 2012 to 2018 (US$ million)Capital Costs 2012 to 2018 (US$ million)Capital Costs 2012 to 2018 (US$ million)Capital Costs 2035 to 2040 (US$ million)Operating Costs 2025 to 2034 (US$ million)Cash flow (US$ million)
- 32 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Dumbarton Area
The Dumbarton Area includes the mature Dumbarton, Lochranza and Balloch fields 220 kilometres northeast of Aberdeen.Dumbarton is a ...
$3,720Elgin Franklin Area
The Elgin and Franklin Area includes the ultra high pressure-high temperature (uHP/HT) Elgin, Franklin, West Franklin and Glenelg ...
$6,900Azulao Area
The Azulão Area consists of Eneva's operated fields in the north region of Brazil.The area encompasses Azulão, ...
$3,720