MonArb Area
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- North Cayley development plan delayed
- Development drilling on Montrose hub to prolong production
- Third party tie-backs offer upside potential
- Emissions reductions requirements
- Arbroath
- Montrose
- Future infill drilling
- Arbroath
- Arkwright
- Brechin
- Wood
- Godwin
- Cayley
- Shaw
- Capital costs
- Montrose
- Arbroath
- 18 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Pipeline summaryCapital Costs Pre-2017 to 2024 (US$ million)Capital Costs Pre-2017 to 2025 (US$ million)
-
Capital Costs Pre-2017 to 2024 (US$ million)Capital Costs 2012 to 2016 (US$ million)Capital Costs 2008 to 2017 (US$ million)Capital Costs 2012 to 2018 (US$ million)Capital Costs 2012 to 2018 (US$ million)Capital Costs 2012 to 2018 (US$ million)Capital Costs 2035 to 2040 (US$ million)Operating Costs 2025 to 2034 (US$ million)Cash flow (US$ million)
- 32 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Gjøa Area
The Gjøa Area consists of three oil and gas fields 60 kilometres north of the Troll Øst field in the Northern North Sea.
$5,280Kuatamlonmunai Area
The Kuatamlonmunai (KAM) JV operates the Konys and Bektas oil fields in central Kazakhstan. The project is 100%-owned by Chinese ...
$3,720Dumbarton Area
The Dumbarton Area includes the mature Dumbarton, Lochranza and Balloch fields 220 kilometres northeast of Aberdeen.Dumbarton is a ...
$3,720