Asset Report

Ohanet

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Ohanet is a wet gas development located in the Illizi Basin in eastern Algeria, 100 kilometres west of the Alrar gas field on the Libyan border. The field was developed by a consortium of BHP, Japan Ohanet Oil and Gas Co, Woodside and Petrofac. The international consortium exited the project in 2011 with sole equity reverting to the Algeria NOC, Sonatrach.The main discoveries on the block were made in the late 1950s and early 1960s. The largest discovery on the block - Ohanet - was made in ...

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
    • Risk service contract production
    • Post contract production (post-2011)
    • Risk service contract
      • Central processing facility
      • Drilling
    • Concession contract
  • Infrastructure
    • Capital costs
      • Risk service contract
      • Post contract production (post-2011)
    • Operating costs
  • Sales contracts
    • Concession contract (post 2011)
    • Risk service contract (2003-2011)
      • Cost recovery
      • Remuneration fee
      • Income tax
      • Royalty
      • Bonuses
      • Petroleum windfall tax
    • Cash flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Gas price
    • Global Economic Model (GEM) file
    • Cash Flow

Tables and charts

This report includes 30 images and tables including:

  • Key facts: Table 1
  • Index map
  • Ohanet map
  • Participation: Table 1
  • Participation: Table 2
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Infrastructure: Table 1
  • Sales contracts: Table 1
  • Production: Table 1
  • Production: Table 2
  • Production: Table 3
  • RSC production profile
  • Concession contract production profile (post-2011)
  • Costs: Table 4
  • Ohanet Area
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Remaining Present Value Price Sensitivities
  • Ohanet - Risk Service Contract
  • Economic analysis: Table 5
  • Economic analysis: Table 6
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Fiscal and regulatory: Table 1

What's included

This report contains:

  • Document

    Ohanet

    PDF 6.93 MB