Asset Report
OML 143 (Okwuibome)
This report is currently unavailable
Report summary
OML 143 is located in thickly forested terrain in the northern Niger Delta. It contains two producing fields, Okwuibome - discovered by Shell in 1979 - and the smaller Anieze field.Shell's OML 39 was rescinded in 2005 and was re-awarded as OPL 280 to Indian company Sterling Global in 2007 in partnership with a local company Allene Energy. Sterling Global is part of the Sandesara Group, an Indian conglomerate owning companies in industries including oil and gas, engineering, ...
Why buy this report?
This report offers data and insights into OML 143 (Okwuibome) that will help you to evaluate opportunities in the region. Key data within the report includes:
- Well data
- Commercial reserves
- Technical reserves
- Production estimates until 2030
- Pipeline summary
This report offers:
Wood Mackenzie's estimate of commercially recoverable reserves from OML 143
- Our opinion on expected production versus operator estimated potential
- Estimated capital costs and operating costs
- Economic analysis
- Location maps
Table of contents
- Key facts
-
Summary and key issues
- Summary
-
Key issues
- Petroleum Industry Act
- Low-cost drilling
- Barging
- Gas monetisation
- Location maps
- Participation
- Geology
- Well data
- Exploration
- Reserves and resources
- Production
- Development
- Infrastructure
-
Costs
- Capital costs
- Operating costs
- Sales contracts
- Fiscal and regulatory
-
Economic assumptions
- Discount rate and date
- Inflation rate
- Oil price
- Global Economic Model (GEM)
- Economic analysis
Tables and charts
This report includes 21 images and tables including:
- Key facts: Table 1
- Index Map
- OML 143 Map
- Participation: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Reserves and resources: Table 2
- Production: Table 1
- Production: Table 2
- OML 143 Production Profile
- Cash flow
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
- Remaining PV Price Sensitivities
- Costs: Table 1
- Costs: Table 2
- Costs: Table 3
What's included
This report contains:
Other reports you may be interested in
Asset Report
Platreef nickel project
Platreef nickel asset cost profile
$2,250
Asset Report
Nigeria LNG (NLNG) - Transportation Infrastructure
The NLNG plant is supplied with feedgas from five gas gathering networks: GTS1 through to 5
$2,250
Insight
Regulatory overload: Nigeria research trip key takeaways
Are the PIA fiscal terms worth it for investors?
$1,350