OML 86 is a shallow water block in the central Niger Delta. It has six fields, four of which have been developed. North Apoi and Funiwa still produce oil but are nearing depletion. Crude from OML 86 was exported by pipelines to the Oloibiri Floating Storage and Offloading (FSO) vessel. The FSO was located 30 kilometres offshore due to the shallow water across OML 86. The FSO has been attacked by militants in the past. It was moved off-site in 2009 and smaller vessels have since been used to ...
Table of contents
- Key facts
-
Summary and key issues
- Summary
-
Key issues
- Chevron divestment completed
- Large contingent gas resources with FLNG potential
- Petroleum Industry Act
- Location maps
- Participation
-
Geology
- North Apoi/Funiwa
- Okubie
- Well data
- Exploration
- Reserves and resources
- Production
-
Development
- North Apoi/Funiwa
- Funiwa gas project
- Okubie & Sengana
- Infrastructure
-
Costs
- Sunk costs
- Abandonment costs
- Capital costs
- Operating costs
- Fiscal and regulatory
-
Economic assumptions
- Cash flow
- Discount rate and date
- Inflation rate
- Tariff receipts
- Oil price
- Global Economic Model (GEM) File
- Economic analysis
Tables and charts
This report includes 22 images and tables including:
- Key facts: Table 1
- Index Map
- OML 86 Map
- Participation: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Reserves and resources: Table 2
- Production: Table 1
- Production: Table 2
- OML 86 Production Profile
- Infrastructure: Table 1
- Cash flow
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2023
- Remaining PV Price Sensitivities
- Geology: Table 1
- Costs: Table 1
- Costs: Table 2
- Costs: Table 3
What's included
This report contains:
Other reports you may be interested in
Asset Report
Chambishi (NFC) copper smelter
A detailed analysis of the Chambishi (NFC) copper smelter.
$2,250
Asset Report
Nigeria LNG (NLNG) - Transportation Infrastructure
The NLNG plant is supplied with feedgas from five gas gathering networks: GTS1 through to 5
$2,250
Asset Report
Point of Ayr Gas Terminal
The Point of Ayr Gas terminal is located in Flintshire, North Wales, at the mouth of the Dee estuary, and receives gas from the ...
$2,150