Asset Report

Peace River/Carmon Creek

Get this report

$2,300

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

01 February 2018

Peace River/Carmon Creek

Report summary

The Peace River project lies 300 kilometres to the west of the main Athabasca oil sands deposit in northeastern Alberta. CNRL operates the project with a 100% interest. Bitumen is currently recovered using the Cyclic Steam Stimulation (CSS) method with horizontal wells. The current plant capacity is 12,500 b/d of bitumen. Shell had proposed an expansion at Peace River, named Carmon Creek. The expansion consisted of two phases, each with a capacity of 40,000 b/d. The Carmon Creek ...

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Production
    • Key Development Metrics
      • Wells/SOR
      • Plant Facilities
    • Initial Development
    • Carmon Creek Expansion
  • Infrastructure
    • Capital Costs
    • Operating Costs
      • Fixed Field Cost
      • Fuel Gas Cost
      • Transportation Costs
      • Total Opex
  • Fiscal and regulatory
    • Cash flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Gas price
    • Exchange rate
    • Global Economic Model (GEM) filename
  • Economic analysis

Tables and charts

This report includes 21 images and tables including:

  • Key facts: Table 1
  • Peace River Index Map
  • Peace River Detail Map
  • Participation: Table 1
  • Geology: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Production: Table 2
  • Production Profile
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2019
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2019)
  • Remaining PV Price Sensitivities
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3

What's included

This report contains:

  • Document

    Peace River/Carmon Creek

    PDF 2.15 MB

  • Document

    Peace River/Carmon Creek

    XLS 324.00 KB

  • Document

    Peace River/Carmon Creek

    ZIP 2.05 MB