Asset Report

PM6

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The PM6 PSC includes the Dulang and Resak fields. The Dulang oil field was developed by PETRONAS Carigali under a unitisation agreement with Exxon. The development incorporates four platforms, a floating storage and offloading system (FSO) and a subsea pipeline network. From 2007, Dulang was assigned entirely to the PM6 PSC. The Resak gas/condensate field was brought onstream in January 2000 with produced gas piped to Kerteh via a purpose-built pipeline. In December 2003, the gas pipeline ...

Table of contents

  • Summary
  • Key Issues
    • Emissions
    • Future development plan (Phase 4 and Phase 5)
    • Upcoming development (Phase 3)
    • Dulang re-development (Phase 2)
    • Historical development (Phase 1)
    • Upstream transfer price - Malaysia Reference Price (MRP)
  • Other Assumptions
  • Gas Price
  • Global Economic Model (GEM) file
  • Cash Flow
  • Indicative Technical Valuations

Tables and charts

This report includes the following images and tables:

    Index MapPM6 MapParticipation
    Reserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Production (2015-2024)Production ProfilePlatform SummaryPlatform SummaryPipeline SummaryExploration Costs 2018 to 2024 (US$ million)
  • 11 more item(s)...

What's included

This report contains:

  • Document

    PM6

    PDF 3.08 MB

  • Document

    PM6

    PDF 2.07 MB