Asset Report
PM6
Report summary
The PM6 PSC encompasses the Dulang and Resak fields. The Dulang oil field was developed by Petronas Carigali under a unitisation agreement with Exxon. The field development incorporates four platforms, a floating storage and offloading system and a subsea pipeline network. From 2007, Dulang was assigned entirely to the PM6 PSC. The Resak gas/condensate field was brought onstream in January 2000 with produced gas piped to Kerteh via a purpose-built pipeline. In December 2003, the gas ...
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
-
Participation
- Unitisation
- Well data
- Reserves and resources
-
Production
- Emissions
-
Development
-
Oil
- Redevelopment plans - Dulang Enhanced Oil Recovery (EOR) project
- Historical development
- Gas
-
Oil
- Infrastructure
- Costs
-
Sales contracts
- Upstream transfer price - Malaysia Reference Price (MRP)
-
Fiscal and regulatory
- Other Assumptions
-
Economic assumptions
- Cash Flow
- Discount rate and date
- Inflation rate
- Oil price
- Gas Price
- Global Economic Model (GEM) file
- Economic analysis
Tables and charts
This report includes 27 images and tables including:
- Key facts: Table 1
- Index Map
- PM6 Map
- Participation: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Reserves and resources: Table 2
- Production: Table 1
- Production: Table 2
- Production Profile
- Infrastructure: Table 1
- Costs: Table 1
- Costs: Table 2
- Costs: Table 3
- Costs: Table 4
- Fiscal and regulatory: Table 1
- Fiscal and regulatory: Table 2
- Cash Flow
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining Present Value Price Sensitivities
- Sales contracts: Table 1
- Development: Table 1
- Development: Table 2
What's included
This report contains: