Asset Report

Rabi

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Shell discovered Rabi in 1985 and brought it onstream in 1989. Production peaked in 1997. Several fields have been discovered close to Rabi, and although much smaller, Rabi's infrastructure and export pipelines greatly enhance the development economics of the satellites. Oil from the Rabi area is piped to two separate destinations: northwards to Total Gabon's Cap Lopez terminal and southwards to Shell's Gamba terminal.Production from Rabi has been in decline since ...

Table of contents

  • Summary
  • Key Issues
  • Oil
    • Recent development activities
    • Future development
    • Historical
    • Drilling
    • Gamba
    • Cap Lopez
  • Capital costs
    • Rabi Kounga II PSC licence renewal
    • Rabi PSC
  • PSC terms post 2003
    • Royalty
    • Corporation tax
  • Cash Flow
  • Global Economic Model (GEM) Files
  • Cash Flow
  • 2 more item(s)...

Tables and charts

This report includes the following images and tables:

    Index mapRabi mapRabi PSC participation
    Field hydrocarbon propertiesReservoir characteristicsReserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Production (2015-2024)Rabi historic production profile (concession terms)Rabi production profile (PSC terms)Capital Costs Pre-2016 to 2024 (US$ million)
  • 15 more item(s)...

What's included

This report contains:

  • Document

    Rabi

    PDF 3.55 MB