Shearwater Area
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Shearwater gas hub strategy
- Infill drilling could support production and extend field life
- Potential tie-backs face hurdles
- Full electrification unlikely to progress
- Emissions
- Shearwater
- Scoter
- Fram
- Capital costs
- Shearwater
- Baroli
- Merganser
- Scoter
- Starling
- 7 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Platform summaryPipeline summaryCapital Costs Pre-2016 to 2024 (US$ million)
-
Capital Costs 2015 to 2019 (US$ million)Capital Costs 2005 to 2011 (US$ million)Capital Costs 2002 to 2011 (US$ million)Capital Costs Pre-2008 to 2010 (US$ million)Capital Costs 2018 to 2024 (US$ million)Capital Costs Pre-2021 to 2026 (US$ million)Operating Costs 2025 to 2034 (US$ million)Index mapShearwater map
- 53 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Dumbarton Area
The Dumbarton Area includes the mature Dumbarton, Lochranza and Balloch fields 220 kilometres northeast of Aberdeen.Dumbarton is a ...
$3,720Muradkhanli Contract Area
State-owned SOCAR currently operates the onshore Muradkhanli Contract Area, which contains three core oil fields: Muradkhanli, Jafarly ...
$3,720El Tordillo Area
The El Tordillo Area comprises three separate licenses in the northeastern San Jorge Basin operated by Crown Point Energy: El Tordillo...
$3,720