Report summary
SummaryThe TotalEnergies-operated Shetland Gas Plant (SGP) was constructed between 2011 and 2015 to process gas volumes from the Greater Laggan Area fields. The plant is at Sullom Voe, adjacent to the existing EnQuest-operated Sullom Voe Terminal (SVT). After processing at SGP, dry gas is exported to St Fergus (NSMP) via the Shetland Island Regional Gas Export (SIRGE) pipeline, which was commissioned in 2016. SIRGE connects to the Frigg UK system at the MCP01 tie-in point. Condensates are ...
Table of contents
- Key facts
-
Summary
- Summary
- Location maps
- Participation
-
Development
- Shetland Gas Plant
- Shetland Islands Regional Gas Export (SIRGE) Pipeline
-
Throughput
- Shetland Gas Plant throughput
-
SIRGE Pipeline throughput
- Future potential
-
Costs
- Shetland Gas Plant
- SIRGE Pipeline
Tables and charts
This report includes 6 images and tables including:
- Key facts: Table 1
- Map
- Participation: Table 1
- Participation: Table 2
- Throughput: Table 1
- Throughput: Table 2
What's included
This report contains:
Other reports you may be interested in
Asset Report
Sullom Voe Terminal
The Sullom Voe Terminal (SVT) on the Shetland Islands was initiated in 1975, and received its first crude from the Brent field in 1978. ...
$2,150
Asset Report
Solan
The Solan oil field lies 150 kilometres west of the Shetland Islands and 35 kilometres south of the Schiehallion field. Solan is ...
$4,400
Asset Report
St Fergus (NSMP)
The North Sea Midstream Partners (NSMP) owned terminal facilities at St Fergus currently provide a landing point for two offshore gas ...