Asset Report

Shetland Gas Plant

Get this report*

$2,580

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

SummaryThe Shetland Gas Plant (SGP) was constructed between 2011 and 2015 to process gas volumes from the Greater Laggan Area (GLA) fields. The plant is adjacent to the EnQuest-operated Sullom Voe Terminal (SVT). After processing at SGP, dry gas is exported to St Fergus (NSMP) via the Shetland Island Regional Gas Export (SIRGE) pipeline, which was commissioned in 2016. SIRGE connects to the Frigg UK system at the MCP01 tie-in point. Condensates are exported via SVT. SGP received first gas ...

Table of contents

    • Summary
    • Serica Energy takes over operatorship of Shetland Gas Plan t
    • More throughput needed to maintain operations at SGP
    • Economics at SGP and GLA supported by strongly -performing Victory tie-back
    • Serica Energy revisiting Glendronach
    • Infill drilling and exploration prospects offer upside potential
    • Shetland Gas Plant
    • SIRGE pipeline
    • Shetland Gas Plant (SGP)
    • 1 more item(s)...
  • Shetland Gas Plant throughput
    • Shetland Gas Plant
    • SIRGE Pipeline

Tables and charts

This report includes the following images and tables:

    MapSIRGE Pipeline Participation

What's included

This report contains:

  • Document

    Shetland Gas Plant

    XLS 221.00 KB

  • Document

    Shetland Gas Plant

    PDF 1.55 MB