Asset Report

Shetland Gas Plant

Get this report

$2,150

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

SummaryThe TotalEnergies-operated Shetland Gas Plant (SGP) was constructed between 2011 and 2015 to process gas volumes from the Greater Laggan Area fields. The plant is at Sullom Voe, adjacent to the existing EnQuest-operated Sullom Voe Terminal (SVT). After processing at SGP, dry gas is exported to St Fergus (NSMP) via the Shetland Island Regional Gas Export (SIRGE) pipeline, which was commissioned in 2016. SIRGE connects to the Frigg UK system at the MCP01 tie-in point. Condensates are ...

Table of contents

  • Key facts
    • Summary
  • Location maps
  • Participation
    • Shetland Gas Plant
    • Shetland Islands Regional Gas Export (SIRGE) Pipeline
    • Shetland Gas Plant throughput
    • SIRGE Pipeline throughput
      • Future potential
    • Shetland Gas Plant
    • SIRGE Pipeline

Tables and charts

This report includes 6 images and tables including:

  • Key facts: Table 1
  • Map
  • Participation: Table 1
  • Participation: Table 2
  • Throughput: Table 1
  • Throughput: Table 2

What's included

This report contains:

  • Document

    Shetland Gas Plant

    PDF 2.48 MB

  • Document

    Shetland Gas Plant

    XLS 271.50 KB