Sillimanite (UK)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Production decline rate uncertainty
- Decommissioning costs
- Operating costs
- Cash Flow
-
Cash Flow
- Cash flow (US$ million)
- Cash flow (£ million)
Tables and charts
This report includes the following images and tables:
-
Capital Costs 2031 to 2032 (£ million)Operating Costs 2024 to 2030 (£ million)Annual Gas Prices
-
Index mapSillimanite mapParticipationReserves (2P) at 01/01/2026Production (2020-2024)Production profilePipeline SummaryCapital Costs 2019 to 2024 (£ million)
- 10 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Gassled-Langeled
The Langeled system is one of the longest subsea gas export lines in the world and connects the Nyhamna terminal to the UK.
$2,580Bøyla Area
The Bøyla Area covers the producing Bøyla and Frosk fields to the south of Alvheim.
$5,280Gassled-Vesterled Pipeline
The Vesterled system is a link between the Norwegian gas pipeline system and the UK gas market.
$2,580