Siri Area
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- 2025 production shutdown
- Late-life stage
- Workover wells steadied production decline
- Project Greensand - Carbon capture and storage (CCS) potential
- Decommissioning plan uncertain
- Danish carbon tax set to be introduced in 2025
- Siri Main Field
- Stine-1 and Stine-2
- 6 more item(s)...
- Capital costs
- Decommissioning costs
-
Operating costs
- Emissions taxes
- Cash flow
- Fiscal Terms
- Global Economic Model (GEM) file
- Cash Flow
- Cash flow (US$ million)
- Cash flow (DKr million)
Tables and charts
This report includes the following images and tables:
-
Capital Costs Pre-2013 to 2019 ( million)Capital Costs 2027 to 2036 ( million)Cash Flow (US$)
-
PV Table (US$)Summary Table (US$)Split of RevenuesCumulative Net Cash Flow - UndiscountedCumulative Net Cash Flow - Discounted at 10% from 01/01/2026Remaining Present Value Price SensitivitiesCash Flow (Local Currency)PV Table (Local Currency)Summary Table (Local Currency)
- 11 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Enfield Area
The Enfield Area analysis includes the original Enfield Area development, and the newer Greater Enfield project.
$3,720Pyrenees Area
The Pyrenees Area includes a number of offshore heavy oil fields in the Exmouth sub-basin of the Carnarvon Basin.
Talinga Area
The Talinga coal seam gas (CSG) field is located on a structural high called the Undulla Nose.