Asset Report

Sunrise

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Sunrise project (formerly part of the Kearl project) is located in the Athabasca oil sands region of Canada, 60 kilometres northeast of Fort McMurray, Alberta. Production from Phase 1 of the SAGD development began in 2015. Historical backgroundExxonMobil proposed the Kearl project in 1997, estimating the recoverable resources at approximately 1.2 to 1.4 billion barrels. In 1999, the operator, Imperial Oil (majority-owned by ExxonMobil), put development of Kearl on hold due to economic ...

Table of contents

Tables and charts

This report includes the following images and tables:

    Sunrise Index MapSunrise Detail MapReservoir Characteristics
    Reserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Production (2015-2024)Production ProfileCapital Costs Pre-2016 to 2024 (US$ million)Cash Flow (US$)PV Table (US$)Summary Table (US$)Split of Revenues
  • 4 more item(s)...

What's included

This report contains:

  • Document

    Sunrise

    XLS 610.50 KB

  • Document

    Sunrise

    PDF 2.22 MB