Asset Report

Timimoun (325a/329)

From

$1,700.00

You can pay by card or invoice

From

$1,700.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Timimoun fields are located in the Gourara basin in south west Algeria, approximately 550km south of the Hassi R'Mel field. The acreage (blocks 325a/329) was awarded to Total and Cepsa in July 2002 and after the seven year appraisal and exploration period, the partners were awarded a development licence for the seven fields on the block. Development work started in 2014. First gas is expected in 2017 and is planned to plateau for around ten years.The Timimoun ...

What's included

This report contains

  • Document

    Timimoun (325a/329)

    PDF 5.41 MB

  • Document

    Timimoun (325a/329)

    XLS 656.00 KB

  • Document

    Timimoun (325a/329)

    ZIP 5.96 MB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Well data
    • Exploration Activity
  • Reserves and resources
  • Production
    • Drilling
    • Processing equipment and pipelines
    • Civil works, roads, airstrip
  • Infrastructure
    • Exploration costs
    • Capital costs
    • Operating costs
  • Sales contracts
    • Block 'k factor'
    • Petroleum Windfall Tax
    • Cash Flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Gas Price
    • Global Economic Model (GEM) file
  • Economic analysis

Tables and charts

This report includes 22 images and tables including:

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Well data: Table 1
  • Commitments
  • Reserves and resources: Table 1
  • Production: Table 1
  • Infrastructure: Table 1
  • Sales contracts: Table 1
  • Fiscal and regulatory: Table 1
  • Cash flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Costs: Table 1
  • Costs: Table 2

Images

  • Index Map
  • Timimoun (325a/329) map
  • Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining PV Price Sensitivities

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898