Torxen Palliser JV Alberta
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
- Participation
- Geology
- Reserves and resources
- Production
- Development
- Costs
- Fiscal and regulatory
-
Economic assumptions
- Cash flow
- Economic analysis
Tables and charts
This report includes the following images and tables:
- Key facts: Table 1
- Torxen / SLB well locations
- Reserves and resources: Table 1
- Production: Table 1
- Production Profile
- Costs: Table 1
- Costs: Table 2
- Cash flow
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- 3 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Suncor SAGD Project (Firebag)
Suncor holds a number of leases near its mining operation that are being developed using Steam Assisted Gravity Drainage (SAGD), known ...
$3,720Wide Berth (GC 490)
Wide Berth (GC 490) is a small gas and associated condensate field located in the Green Canyon protraction area of the Central Gulf of ...
$3,720Mannville CBM unconventional play
A detailed analysis of the Mannville CBM unconventional play.
$2,800