Asset report

Trans Adriatic Pipeline (TAP)

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The Trans Adriatic Pipeline (TAP) will be the final stage of Europe's Southern Gas Corridor delivering 970 mmcfd (10 bcm per year) of Shah Deniz Phase Two gas to southern Italy via Greece Albania and the Adriatic Sea. The pipeline will start at the Greece Turkey border where it will connect with the new build Trans Anatolian Pipeline (TANAP) which will transport Shah Deniz gas across Turkey.The official groundbreaking ceremony for TAP was held in May 2016 with onshore construction ...

What's included

This report contains

  • Document

    Trans Adriatic Pipeline (TAP)

    PDF 890.71 KB

  • Document

    Trans Adriatic Pipeline (TAP)

    XLS 142.00 KB

  • Document

    Trans Adriatic Pipeline (TAP)

    ZIP 976.98 KB

Table of contents

Tables and charts

This report includes 5 images and tables including:

Images

  • Trans Adriatic Pipeline (TAP) map
  • TAP throughput profile

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Throughput: Table 1

You may be interested in

Asset report

Tyra Area

Asset report

Liverpool Bay

Asset report

Curlew Area

    
            
            
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898