Asset Report

Wandoo

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Wandoo is a mature heavy oil field located offshore Western Australia in the Dampier Sub-Basin. Production commenced in October 1993 under an extended production test. A full-scale development, costing US$283 million, was brought onstream in March 1997, at an initial rate of 30,000 b/d. The processing and drilling facilities are housed on a large steel base which is fixed to a gravity-based concrete structure (Wandoo B) located on the seabed.

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Well data
  • Reserves and resources
  • Production
    • Wandoo A
      • Monopod
      • Extended Production Test (EPT)
      • Wells
    • Wandoo B
      • Central production platform supported by a Concrete Gravity Structure (CGS)
      • Wells
  • Infrastructure
  • Costs
    • PRRT
    • Corporate income tax
    • Cash Flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Global Economic Model (GEM) file
  • 1 more item(s)...

Tables and charts

This report includes the following images and tables:

  • Key facts: Table 1
  • Index Map
  • Wandoo Detail Map
  • Participation: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Production Profile
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • 8 more item(s)...

What's included

This report contains:

  • Document

    Wandoo

    PDF 5.33 MB

  • Document

    Wandoo

    XLS 613.50 KB