West El Burullus
This report is currently unavailable
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Wells
- Facilities
- Exploration Costs
- Capital Costs
- Abandonment Costs
- Operating Costs
- Cost Condensate/Gas
- Profit Condensate/Gas
- Cash Flow
- Gas price
- 1 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Index MapWest El Burullus MapParticipation
-
Discovery wellsReserves (2P) at 01/01/2026Production (2025-2034)Production ProfilePipeline SummaryCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2025 to 2029 (US$ million)Annual Gas Prices
- 8 more item(s)...
What's included
This report contains:
Other reports you may be interested in
El Aouj iron ore mine
A feasibility study for Stage 1 of the 11 Mtpa El Aouj deposit was completed at the end of 2015; the mine will start operating in Q1 2027.
$2,250West Sak (Kuparuk River Unit)
West Sak is a large, shallow, viscous oil reservoir within the Kuparuk River Unit. West Sak contains eight billion barrels of oil in ...
$3,720El Mangrullo
El Mangrullo area is located in the Neuquina basin, Province of Neuquén.Since 2016, Pampa Energía (Pampa) is the operator ...
$3,720