- Wisting project moving forward after delays and high costs but major uncertainties remain
- Revised concept to include a new-build ship-shaped FPSO but well count remains high
- Shallow reservoir challenges
- Power from shore dropped with Carbon Capture and Storage being considered
- Intrepid Eagle could be used for CO2 and temporary gas storage
- Shallow reservoir challenges
- Resource estimates vary and recent exploration has failed to delivermaterial upside
- Remote location in the Barents Sea
- 2 more item(s)...
- Emissions
- Capital costs
- Decommissioning costs
- Operating costs
- Global Economic Model (GEM) file
- Cash Flow (US$ million)
- Cash flow (NKr million)
Tables and charts
This report includes the following images and tables:
-
Capital Costs 2028 to 2037 (NKr million)Capital Costs 2062 to 2064 (NKr million)Operating Costs 2032 to 2041 (NKr million)
-
Cash flow (US$ million)Cash flow PV (US$ million)Summary Table (US$)Split of RevenuesCumulative Net Cash Flow - UndiscountedRemaining PV Price SensitivitiesCash flow (NKr million)Cash flow PV (NKr million)Index map
- 6 more item(s)...
What's included
This report contains: