Asset Report

Zaafrane Fields

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Zaafrane licence is located in central Tunisia on the northern flank of the Talamzane Arch. The operator, Mazarine Energy, made two discoveries in 2015 called Dhouar Ghrib and Chouchet El Atrous. The Ghrib concession was carved out of the Zaafrane permit and both the fields were brought onstream in 2017 via leased early production facilities (EPF).In 2019, the operator made another discovery, called Sidi Marzoug, 13 kilometres southeast of Chouchet El Atrous. The field was brought ...

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
    • Emissions
    • Ghrib fields
      • Facilities
      • Key development metrics
    • Sidi Marzoug
  • Infrastructure
    • Exploration costs
    • Capital costs
    • Operating costs
  • Sales contracts
  • Fiscal and regulatory
    • Cash flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Gas price
    • Cash flow
      • Ghrib concession fields
      • Sidi Marzoug

Tables and charts

This report includes 30 images and tables including:

  • Key facts: Table 1
  • Index map
  • Zaafrane map
  • Participation: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Production profile: Ghrib concession fields
  • Production profile: Sidi Marzoug
  • Sales contracts: Table 1
  • Fiscal and regulatory: Table 1
  • Fiscal and regulatory: Table 2
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Economic analysis: Table 1
  • Economic analysis: Table 2
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
  • Remaining PV Price Sensitivities
  • Economic analysis: Table 3
  • Economic analysis: Table 4
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
  • Remaining PV Price Sensitivities

What's included

This report contains:

  • Document

    Zaafrane Fields

    PDF 5.02 MB