CCS: upstream’s commercial conundrum
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Executive summary
- CCS: back to the future
- CCS in an upstream context
-
The future challenges for upstream CCS: regulatory, commercial and subsurface
- 1. Regulatory: law, liability and leaks
- 2. Commercial: a question of cost or a question of value?
- 3. Subsurface: When the details matter
- Where next?
Tables and charts
This report includes the following images and tables:
-
Carbon capture capacity – our current trajectory (ETO) vs scenario required to limit global warming by 2 degrees (AET-2)Key upstream CCS projects to watchRegulatory case study
-
The cost of CCS vs carbon price – pre-tax IRR based on CCS projects creating revenue from sequestrationCommercial case studySubsurface case study
What's included
This report contains:
Other reports you may be interested in
CPO 9 Area
The Akacias field was brought onstream in early 2011, although it was not declared commercial until December 2013. It produced under an ...
$3,720Kangean
The Kangean PSC is a large, scattered block covering several commercial gas discoveries.
$3,720Adriatic Sea fields
INA and Energean produce gas from offshore platforms in Croatia's sector of the Adriatic Sea. Aggregate gross output is currently ...
$3,720