Liza and other discoveries
This report is currently unavailable
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Next development phases
- Operational excellence
- Gas-to-energy project
- Regulatory capacity challenges
- Venezuela border dispute rumbles in the background, but is of limited concern
-
History
- Facilities
- Wells
- Exploration costs
- Capital costs
-
Operating costs
- Field costs
- Lease costs
- Oil
- Gas
- Cash flow
- Global Economic Model (GEM) file
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Key wellsReserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026
-
Production (2019-2028)Production ProfileCapital Costs 2016 to 2025 (US$ million)Cash Flow (US$)PV Table (US$)Summary Table (US$)Split of RevenuesCumulative Net Cash Flow - UndiscountedCumulative Net Cash Flow - Discounted at 10% from 01/01/2026
- 8 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Roystonea and other discoveries (Block 52)
Petronas and ExxonMobil have made three deepwater discoveries in Block 52: Sloanea (2020), Roystonea (2023) and Fusaea (2024). The ...
$3,720SK408 (LNG)
The SK408 PSC contains a series of pinnacle-reef gas fields operated by SapuraOMV. The largest gas field, Jerun started production in 2024
$3,720Norway other fields (sub-commercial) North Sea
Data on the fields we currently classify as sub-commercial are available below. Sub-commercial fields contain hydrocarbon volumes that ...
$5,280