Asset Report
Jellinbah East coal mine
Report summary
Jellinbah East is a surface mine in the southern Bowen Basin producing primarily metallurgical coal for export markets. The mine pioneered the sale of ultra low-volatile (ULV) coal for pulverised coal injection (PCI), and began operations in 1989. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
-
Emissions
- Coal seams
- Production
- Production
- Economic assumptions
Tables and charts
This report includes 16 images and tables including:
- Jellinbah East Thermal Coal Emission Intensity Quartile Ranking - Total global production - Saleable tonnes
- Jellinbah East Metallurgical Coal Emission Intensity Quartile Ranking - Total global production - Saleable tonnes
- Detailed map
- Participation
- Marketable reserves
- Operations
- Infrastructure
- Cash costs
- Cash costs
- Capital costs
- Product quality
What's included
This report contains:
Other reports you may be interested in
Asset Report
Ganda Alam Makmur coal mine
A detailed analysis of the Ganda Alam Makmur coal mine.
$2,550
Asset Report
Tambang Batubara Harum coal mine
Detailed asset level data for the Tambang Batubara Harum coal mine
$2,550
Asset Report
Anugerah Bara Kaltim coal mine
A detailed analysis of the Anugerah Bara Kaltim coal mine.
$2,550