Asset report

Multi Harapan Utama Busang coal mine

From

$1,500.00

Get this report

From

$1,500.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The Busang operation is part of the Multi Harapan Utama concession area which spans 475 square kilometres and is located 60 kilometres south west of Samarinda East Kalimantan. The Busang mine deplete its reserves by the end of 2012. There are additional resources that will could enable the mine to continue operating but these lie under plantation forests. Multi Harapan Utama has not been able to acquire the land or necessary permits to mine in these areas. Mining operations at Multi...

What's included

This report contains

  • Document

    Multi Harapan Utama Busang coal mine

    PDF 406.52 KB

  • Document

    Multi Harapan Utama Busang coal mine

    ZIP 570.95 KB

  • Document

    Asset Multi Harapan Utama Busang.xls

    XLS 207.00 KB

  • Document

    Multi Harapan Utama Busang-Indonesia-BASE.XLS

    XLS 501.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Production
  • Operations
  • Infrastructure
  • Costs
  • Sales contracts
  • Economic assumptions

Tables and charts

This report includes 14 images and tables including:

Images

  • Detailed map
  • Production: Image 1
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Geology: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Operations: Table 1
  • Infrastructure: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Sales contracts: Table 1
  • Economic assumptions: Table 1

You may be interested in?

Asset report

Cook coal mine

Asset report

Quintette coal mine

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898