Asset Report

Mutara Hub (Banyan Koalindo Lestari) coal mine

Get this report

$2,550

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Mutara Hub, formerly Muba, owns three mining concessions in Musi Rawas district and Musi Banyuasin district, South Sumatra. The mine started production in 2011. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry-standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download, which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
    • Participation
    • Coal seams
    • Production
    • Operations
    • Infrastructure

Tables and charts

This report includes 13 images and tables including:

  • Detailed map
  • Marketable reserves
  • Production
  • Cash costs
  • Cash costs
  • Capital costs
  • Product quality
  • Economic assumptions

What's included

This report contains:

  • Document

    Mutara Hub (Banyan Koalindo Lestari) coal mine

    PDF 1.09 MB

  • Document

    Mutara Hub coal mine

    ZIP 1.06 MB

  • Document

    Asset_Mutara Hub (Banyan Koalindo Lestari).xlsx

    XLSX 148.05 KB

  • Document

    Mutara Hub (Banyan Koalindo Lestari) LIVE Indonesia BASE.xls

    XLS 537.50 KB