Asset report

Perkasa Inakakerta coal mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Perkasa Inakakerta (PIK) is approximately 70 kilometres north of Bontang East Kalimantan. The 200 square kilometre concession area is immediately to the east of the operating KPC Bengalon area. The mine operates under a Generation III Coal Contract of Work which was awarded on 20 November 1997.

What's included

This report contains

  • Document

    Perkasa Inakakerta coal mine

    PDF 381.70 KB

  • Document

    Perkasa Inakakerta coal mine

    ZIP 556.88 KB

  • Document

    Asset Perkasa Inakakerta.xls

    XLS 210.00 KB

  • Document

    Perkasa Inakakerta-Indonesia-BASE.XLS

    XLS 536.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Production
  • Operations
  • Infrastructure
  • Costs
  • Sales contracts
  • Economic assumptions

Tables and charts

This report includes 14 images and tables including:

Images

  • Detailed map
  • Production: Image 1
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Coal seams
  • Participation: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Operations: Table 1
  • Infrastructure: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Sales contracts: Table 1
  • Economic assumptions: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898