The Maturing of the Powder River Basin
This report is currently unavailable
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- No table of contents specified
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Powder River Basin coal supply summary
PRB will produce less than 210 Mst in 2026 as demand ameliorates from 2025 highs. The basin faces decline in the longer term.
$6,750US Lower 48 unconventional upstream summary
We outline the major themes in US unconventionals and provide an overview of production, capex, and economics for the most important plays.
$1,350Occidental Petroleum - Lower 48 upstream
Upstream valuation of Oxy's assets in the US Lower 48
$22,800