Why Henry Hub mispricing will shake Brazil's 2026 power capacity auction
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Executive summary
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Southern Cone gas and power: 2025 in review
Our recap of the key trends shaping market fundamentals and prices in 2025
$950Beyond costs: How operational flexibility would reshape the 2026 Brazil’s reserve capacity auction
An insight that analyses the upcoming reserve capacity auction in Brazil
$3,000S11D (Northern System) iron ore mine
One of the largest high-grade, direct shipping iron ore mine known in the world. Low costs are due to low-strip and the truckless system.
$2,250