Asset report

Boryeong - LNG regas terminal

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Boryeong is expected to begin commercial operations in January 2017. GS Energy and SK E&S are the joint owners of the terminal. The EPC contract was jointly awarded to GS Energy and SK E&S and construction began in May 2013.Boryeong has a nominal capacity of 3 mmtpa and a peak sendout capacity of 490 tonnes/hour. It has three storage tanks and a total storage capacity of 600 000 m . A fourth storage tank is under construction that is due to be completed in July 2019. The ...

What's included

This report contains

  • Document

    Boryeong - LNG regas terminal

    PDF 331.48 KB

Table of contents

  • Key facts
  • Location maps
  • Terminal overview
  • Utilisation
  • Operational basis
  • Offtake
  • Tariffs
  • Future expansions

Tables and charts

This report includes 4 images and tables including:

Images

  • Map

Tables

  • Key facts: Table 1
  • Key facts: Table 2
  • Key facts: Table 3

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898