Asset Report
Energia del Pacifico LNG Terminal
Report summary
In October 2012, DELSUR, a distribution company subsidiary of Empresas Publicas de Medellin (EPM) in El Salvador, on behalf of 7 distribution companies, launched a call for contracting 350 MW and its energy associated for 20 years DELSUR-CLP-001-2012. Originally the tender contemplated the start of energy delivery in October 2017. Aiming to diversify the energy mix based on the El Savador Energy Policy 2010-2024, technologies using oil products were not allowed to participate in this ...
Table of contents
- Key facts
- Location maps
- Terminal overview
- Utilisation
- Operational basis
- Offtake
- Tariffs
- Future expansions
Tables and charts
This report includes 4 images and tables including:
- Key facts: Table 1
- Key facts: Table 2
- Key facts: Table 3
- Map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Sines - LNG regas terminal
Sines LNG terminal is an onshore LNG import terminal in Alentejo, Portugal.Construction was carried out by Engie's subsidiary, ...
$1,200
Asset Report
Manzanillo - LNG regas terminal
The Manzanillo LNG import terminal (also referred to as terminal KMS) is a conventional, onshore facility situated on the central ...
$1,200
Insight
LNG in brief
Our LNG in brief is a rolling coverage of events as they happen in the global LNG market
$1,050