Asset report

Everett - LNG regas terminal

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Everett was built by the Cabot Corporation to serve winter peaking gas needs for several local utilities in Massachusetts. As peak shaving requirements are often short term and highly contingent upon weather LNG can be a better option than new pipeline builds for this purpose. It is the only regasification facility in the US that has remained in continuous service since its inception. The Federal Power Commission (FPC) the predecessor agency to the Federal Energy regulatory Commission ...

What's included

This report contains

  • Document

    Everett - LNG regas terminal.xls

    XLS 230.50 KB

  • Document

    Everett - LNG regas terminal

    PDF 342.69 KB

  • Document

    Everett - LNG regas terminal

    ZIP 406.89 KB

Table of contents

  • Key facts
  • Location maps
  • Terminal overview
  • Utilisation
  • Operational basis
  • Offtake
  • Tariffs
  • Future expansions

Tables and charts

This report includes 6 images and tables including:

Images

  • Location maps: Image 1
  • Approximate Monthly Import Data by Country

Tables

  • Key facts: Table 1
  • Key facts: Table 2
  • Key facts: Table 3
  • Offtake: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898