Asset Report

Golden Pass LNG Export - Commercial Overview

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

01 February 2019

Golden Pass LNG Export - Commercial Overview

Report summary

Golden Pass LNG Terminal was initially built as a regas facility in a joint venture between Qatar Petroleum (70%), ExxonMobil (17.6%) and ConocoPhillips (12.4%). The facility is located on the Sabine-Neches Waterway to the south of Port Arthur, Texas. Construction was completed in 2010 with imports from Qatar starting in 2011. However, the rapid growth in US shale production eliminated the requirement for imports and the last cargo was received in June 2011. Golden Pass LNG announced in ...

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Commercial structure
  • Timeline
  • LNG output
  • LNG contracts
  • Shipping
  • Economic analysis

Tables and charts

This report includes 8 images and tables including:

  • Key facts: Table 1
  • Commercial structure: Image 1
  • Timeline: Table 1
  • LNG output: Image 1
  • Summary economics
  • Breakeven economics (US$/mmBtu)
  • FOB breakeven analysis (post-tax)
  • Index Map

What's included

This report contains:

  • Document

    Commercial Overview

    PDF 4.19 MB

  • Document

    Commercial Overview

    ZIP 4.14 MB

  • Document

    golden pass summary cash flo.xls

    XLS 103.00 KB

Trusted by leading organisations