Asset Report

Hadera Gateway - LNG regas terminal

Get this report

$950

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

05 October 2016

Hadera Gateway - LNG regas terminal

Report summary

Various locations were considered and a receiving point located 10 kilometres off the coast from Hadera was selected because of security issues and potential objections from residents to a shore-side FSRU.In October 2011, the gas infrastructure company Israel Natural Gas Lines (INGL) signed an agreement with the Italian marine contractor Micoperi to install the offshore buoy and subsea pipeline connections. As well as the Advanced Production and Loading (APL) submerged turret buoy system, a ...

Table of contents

  • Key facts
  • Location maps
  • Country overview
  • Terminal overview
  • Utilisation
  • Operational basis
  • Offtake
  • Tariffs
  • Future expansions

Tables and charts

This report includes 5 images and tables including:

  • Key facts: Table 1
  • Key facts: Table 2
  • Key facts: Table 3
  • Map
  • Approximate Monthly Import Data by Country

What's included

This report contains:

  • Document

    Hadera Gateway - LNG regas terminal.xls

    XLS 186.50 KB

  • Document

    Hadera Gateway - LNG regas terminal

    PDF 374.82 KB

  • Document

    Hadera Gateway - LNG regas terminal

    ZIP 426.99 KB

Other reports you may be interested in

Browse reports by Industry Sector