Asset Report
NFE Altamira - FLNG1
Report summary
New Fortress Energy (NFE) plans the initial start-up of its first company-owned and operated, large scale natural gas liquefaction terminal in late 2023. Located 20 kilometers (12 miles) offshore Altamira, Tamaulipas, Mexico, the Altamira FLNG1 project comprises of a single NFE's Fast LNG unit with nameplate capacity of 1.4 mmtpa. Altamira FLNG1's cost is expected to total $1.4 billion, or $1,000 per tonne, with an NPV10 plant break-even price of $3.26 per mmbtu in 2023 ...
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Commercial structure
- Timeline
- LNG output
- LNG contracts
-
Shipping
- Economic assumptions
- Economic analysis
Tables and charts
This report includes 8 images and tables including:
- Key facts: Table 1
- Commercial structure: Image 1
- Timeline: Table 1
- LNG output: Image 1
- Summary economics
- Breakeven economics (US$/mmBtu)
- FOB breakeven analysis (post-tax)
- Detail Map
What's included
This report contains:
Other reports you may be interested in
Asset Report
NFE Altamira Onshore - FLNG 2
New Fortress Energy (NFE) plans to site, construct, and operate a new 1.4 mmtpa natural gas liquefaction facility at an under-utilized ...
$2,250
Asset Report
NFE Louisiana Fast LNG - Commercial Overview
New Fortress Energy (NFE) plans to site, construct and operate a new offshore natural gas liquefaction terminal located 16 nautical ...
$2,250
Asset Report
Ebano
The Ebano block includes five mature fields in Mexico's Tampico basin: Altamira, Cacalilao, Corcovado, Ebano-Chapanco and Limon. ...
$3,100