Asset Report

Nigeria LNG (NLNG) - Transportation Infrastructure

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The NLNG plant is supplied with feedgas via six major pipelines known as the gas transmission system (GTS).GTS-1 is an onshore pipeline extending 149 kilometres from the Agip JV's Obiafu-Obrikom gas plant to NLNG, terminating in a 150 m3 slugcatcher. Its maximum capacity is 1,250 mmcfd. A 40 kilometres long, 600 mmcfd branch line connects the Shell JV's Soku field to GTS-1 at Rumuji. A line also connects supply from the Obite gas plant which is part of the Total JV. GTS-1 is owned ...

What's included

This report contains

  • Document

    Transportation Infrastructure

    PDF 240.89 KB

Table of contents

  • Development

Tables and charts

No table or charts specified

Questions about this report?

  • Europe:
    +44 131 243 4400
  • Americas:
    +1 713 470 1600
  • Asia Pacific:
    +65 6518 0800