Asset Report

Nigeria LNG (NLNG) - Transportation Infrastructure

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The NLNG plant is supplied with feedgas via six major pipelines known as the gas transmission system (GTS).GTS-1 is a 36-inch onshore pipeline extending 149 kilometres from the Agip JV's Obiafu-Obrikom gas plant to NLNG, terminating in a 150 m3 slugcatcher. Its maximum capacity is 1,250 mmcfd. A 40-kilometre long, 600 mmcfd branch line connects the Shell JV's Soku field to GTS-1 at Rumuji. A line also connects supply from the Obite gas plant which is part of the TotalEnergies JV. ...

Table of contents

  • Development

Tables and charts

No table or charts specified

What's included

This report contains:

  • Document

    Transportation Infrastructure

    PDF 794.49 KB