Asset report

Nigeria LNG (NLNG) - Transportation Infrastructure

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

The NLNG plant is supplied with feedgas via six major pipelines known as the gas transmission system (GTS).GTS-1 is an onshore pipeline extending 149 kilometres from the Agip JV's Obiafu-Obrikom gas plant to NLNG, terminating in a 150 m3 slugcatcher. Its maximum capacity is 1,250 mmcfd. A 40 kilometres long, 600 mmcfd branch line connects the Shell JV's Soku field to GTS-1 at Rumuji. A line also connects supply from the Obite gas plant which is part of the Total JV. GTS-1 is owned ...

What's included

This report contains

  • Document

    Transportation Infrastructure

    PDF 240.89 KB

Table of contents

  • Development

Tables and charts

No table or charts specified

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898