Asset Report

Pagbilao - LNG regas terminal

Get this report

$950

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

16 July 2014

Pagbilao - LNG regas terminal

Report summary

The Energy World Corporation is building a regasification terminal on Grande Island in Pagbilao, Luzon. They intend to build a 1.5 mmtpa onshore regasification terminal in the first phase with expansion plans to double the capacity in the second phase. A 215,000 m3 site on a 20 year lease has been obtained from Malory Properties and the site clearance and formation work has been completed. EWC has appointed Slipform Engineering as the EPC contractors with GTT as the technical advisors ...

Table of contents

  • Key facts
  • Location maps
  • Terminal overview
  • Utilisation
  • Operational basis
  • Offtake
  • Tariffs
  • Future expansions

Tables and charts

This report includes 5 images and tables including:

  • Key facts: Table 1
  • Key facts: Table 2
  • Key facts: Table 3
  • Key facts: Table 4
  • Map

What's included

This report contains:

  • Document

    Pagbilao - LNG regas terminal

    PDF 357.03 KB