Asset report

Polskie - LNG regas terminal

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Construction of Poland's first LNG terminal Polskie LNG started in October 2010. The 484 mmcfd (3.7 mmtpa) facility has two 160 000m storage tanks and is capable of accommodating ships up to 217 000m in size. The contract to build the terminal was awarded in August 2010 to a consortium made up of Saipem Techint Compagnia Technica Internazionale Snamprogetti and Poland's PBG. The site is less than five kilometres from the German border and in August 2010 Germany ...

What's included

This report contains

  • Document

    Polskie - LNG regas terminal

    PDF 432.93 KB

Table of contents

  • Key facts
  • Location maps
  • Terminal overview
  • Utilisation
  • Operational basis
  • Offtake
  • Tariffs
  • Future expansions

Tables and charts

This report includes 4 images and tables including:

Images

  • Map

Tables

  • Key facts: Table 1
  • Key facts: Table 2
  • Key facts: Table 3

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898