Polskie - LNG regas terminal
Report summary
Construction of Poland's first LNG terminal, Polskie LNG, started in October 2010. The 484 mmcfd (3.7 mmtpa) facility has two 160,000m³ storage tanks, and is capable of accommodating ships up to 217,000m³ in size. The contract to build the terminal was awarded in August 2010 to a consortium made up of Saipem, Techint Compagnia Technica Internazionale, Snamprogetti, and Poland's PBG. The site is less than five kilometres from the German border and in August 2010, Germany ...
Table of contents
- Key facts
- Location maps
- Terminal overview
- Utilisation
- Operational basis
- Offtake
- Tariffs
- Future expansions
Tables and charts
This report includes 5 images and tables including:
- Key facts: Table 1
- Key facts: Table 2
- Key facts: Table 3
- Map
- Approximate Monthly Import Data by Country
What's included
This report contains:
Other reports you may be interested in
Asset Report
Sakaide - LNG regas terminal
The Sakaide LNG terminal is located in Sakaide, Kagawa, Japan. The terminal boasts a storage capacity of 180,000 m3 and an annual ...
$1,200
Asset Report
Shanghai - LNG regas terminal
The owner of the terminal, Shanghai LNG, is a joint venture between CNOOC Gas and Power (45%) and Shenergy Group (55%), the Shanghai ...
$1,200
Asset Report
Kita Kyushu (Hibiki) - LNG regas terminal
The Hibiki terminal started commercial operations in November 2014, becoming the third operational terminal on the southern Japanese ...
$1,200