Asset report

Ratnagiri (Dabhol) - LNG regas terminal

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The Dabhol terminal was originally pioneered by Enron as the first integrated LNG and power project in India. Enron completed the first phase of the power project in 1995 and initially ran the first unit on naphtha until LNG became available. Enron's subsidiary the Dabhol Power Company had signed two supply contracts for the terminal one with Oman LNG for the delivery of 1.6mmtpa between 2001 2021 and a second with ADGAS for a supply of 0.48 mmtpa over the same timeframe. However ...

What's included

This report contains

  • Document

    Ratnagiri (Dabhol) - LNG regas terminal.xls

    XLS 178.00 KB

  • Document

    Ratnagiri (Dabhol) - LNG regas terminal 2.xls

    XLS 94.00 KB

  • Document

    Ratnagiri (Dabhol) - LNG regas terminal

    PDF 371.53 KB

  • Document

    Ratnagiri (Dabhol) - LNG regas terminal

    ZIP 487.18 KB

Table of contents

  • Key facts
  • Location maps
  • Terminal overview
  • Utilisation
  • Operational basis
  • Offtake
  • Tariffs
  • Future expansions

Tables and charts

This report includes 5 images and tables including:

Images

  • Map
  • Approximate Monthly Import Data by Country

Tables

  • Key facts: Table 1
  • Key facts: Table 2
  • Key facts: Table 3

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898