Asset Report

Tianjin (Sinopec) - LNG regas terminal

From

$700.00

You can pay by card or invoice

From

$700.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Tianjin (Sinopec) LNG regas project is a conventional land-based regas terminal being built near the Nangang industrial development zone in Tianjin municipality. The initial phase of the project will have a design capacity of 3 mmtpa.Sinopec started construction of its Tianjin LNG terminal in September 2013. This will be Sinopec's third regas terminal and LNG will be supplied from Sinopec's long-term LNG contracts with PNG LNG and APLNG.The project comprises four 160,000-m³ ...

What's included

This report contains

  • Document

    Tianjin (Sinopec) - LNG regas terminal

    PDF 424.17 KB

Table of contents

  • Key facts
  • Location maps
  • Terminal overview
  • Utilisation
  • Operational basis
  • Offtake
  • Tariffs
  • Future expansions

Tables and charts

This report includes 4 images and tables including:

Tables

  • Key facts: Table 1
  • Key facts: Table 2
  • Key facts: Table 3

Images

  • Map

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4400
  • Americas:
    +1 713 470 1600
  • Asia Pacific:
    +65 6518 0800