The Abujar Gold Project is located approximately 30km from Daloa in central western Côte D’Ivoire. The project is owned by Tietto Minerals, and is comprised of three contiguous exploration tenements, Middle, South and North, with a total land area of 1,114 sq.km. An open pit 3.5Mtpa Pre‐Feasibility Study (PFS) was released in April 2021, which expects an 8-year operation, with total gold production of 1,075 koz. An open pit Definitive Feasibility Study (DFS) was released in October 2021, which expects an 11-year operation, with total gold production of 1,690 koz, via a conventional CIL processing circuit with a primary jaw crusher and single stage SAG mill comminution circuit. This circuit is rated for 4.0 Mtpa fresh rock or 4.8Mtpa oxide and transition material