Asset Report

Abujar gold mine project

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Abujar Gold Project is located approximately 30km from Daloa in central western Côte D’Ivoire. The project is owned by Tietto Minerals, and is comprised of three contiguous exploration tenements, Middle, South and North, with a total land area of 1,114 sq.km. An open pit 3.5Mtpa Pre‐Feasibility Study (PFS) was released in April 2021, which expects an 8-year operation, with total gold production of 1,075 koz. An open pit Definitive Feasibility Study (DFS) was released in October 2021, which expects an 11-year operation, with total gold production of 1,690 koz, via a conventional CIL processing circuit with a primary jaw crusher and single stage SAG mill comminution circuit. This circuit is rated for 4.0 Mtpa fresh rock or 4.8Mtpa oxide and transition material

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing

Tables and charts

This report includes 1 images and tables including:

  • Detailed Map

What's included

This report contains:

  • Document

    Abujar gold mine project.xls

    XLS 115.50 KB

  • Document

    Abujar gold mine project

    PDF 1.30 MB