Asset Report

Frieda River gold mine project

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQ's about online orders
- Find out more about subscriptions

08 March 2019

Frieda River gold mine project

Report summary

Frieda River is copper-gold mine project on the border of the Sanduan and East Sepik provinces of Papua New Guinea. An addendum to original feasibility study(completed in May 2016) was released in January 2017 indicates an 18 year mine life and ore processing capacity of 40 million tonnes per year. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

Tables and charts

This report includes 4 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Frieda River Project gold mine

    XLS 118.50 KB

  • Document

    Frieda River gold mine project

    PDF 1.04 MB

  • Document

    Frieda River gold mine project

    ZIP 1.01 MB

Trusted by leading organisations