Asset report

Agua de la Falda (Closed) gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Heap leach production ceased in 2002. The project economics benefited greatly from relatively low capital expenditure to start up due to the mine's proximity to the exhausted El Hueso mine. Ore was trucked to El Hueso for heap leaching. A 1.5% NSR royalty is payable on production in excess of 1Moz from the northern part of the property.

What's included

This report contains

  • Document

    Agua de la Falda (Closed) gold mine

    XLS 120.00 KB

  • Document

    Agua de la Falda (Closed) gold mine

    PDF 477.32 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Operations
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898