Asset Report

Agua de la Falda (Closed) gold mine

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Heap leach production ceased in 2002. The project economics benefited greatly from relatively low capital expenditure to start-up, due to the mine's proximity to the exhausted El Hueso mine. Ore was trucked to El Hueso for heap leaching. A 1.5% NSR royalty is payable on production in excess of 1Moz from the northern part of the property. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Mining
  • Process

Tables and charts

No table or charts specified

What's included

This report contains:

  • Document

    Agua de la Falda (Closed) gold mine

    XLS 112.50 KB

  • Document

    Agua de la Falda (Closed) gold mine

    PDF 1.17 MB