Asset Report
Al Ba itha
Report summary
The Al Ba'itha mine is located on the Az Zabirah bauxite deposit in Saudi Arabia. At full capacity the mine produces about 4.25Mtpa in order to support the associated refinery, located 1800km distant by rail. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Mining
- Process
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Al Furat Production Company (AFPC) operated assets
The Al Furat Production Company (AFPC) operates in the Deir Ez Zor region, close to the River Euphrates (Al Furat), bordering Iraq. It ...
$3,100
Asset Report
Al Shaheen (Block 5)
Al Shaheen is Qatar's largest oil field and is located off the country's north coast, 80 kilometres north of Ras Laffan. The ...
$3,100
Asset Report
Al Yasat Contract Area
The Al Yasat Petroleum joint venture (JV) between ADNOC and CNPC operates two concession areas located onshore and offshore Abu Dhabi. ...
$3,100