Asset Report

Amulsar gold mine project

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Amulsar will be an open pit operation utilising conventional truck and shovel mining methods. The ore production rate will be approximately 10Mt/a. Ore will be processed by two stage crushing, heap leaching, an adsorption, desorption, recovery plant (ADR) and refining. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing
  • CAPEX

Tables and charts

This report includes the following images and tables:

  • Detailed map

What's included

This report contains:

  • Document

    Amulsar gold mine project

    XLS 118.50 KB

  • Document

    Amulsar gold mine project

    PDF 1.24 MB