Asset report

Angostura gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

Angostura project is a high-sulphidation epithermal deposit. Based on the 2012 Preliminary Economic Assessment, it is expected to be mined by underground methods such as sub-level stoping with fill, bench & fill stoping, and cut &fill for 10 years. The ore will be recovered through a 6ktpd processing plant. In August, the Colombian National Mining Agency denied Eco Oro a 2-year extension of the exploration phase of its principal mining title because 50.73% of the principal existing concession falls within a preservation area (Santurbán Páramo).

What's included

This report contains

  • Document

    Angostura Project gold mine

    XLS 123.50 KB

  • Document

    Angostura gold mine project

    PDF 759.15 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898