Asset Report
Angostura gold mine project
Report summary
Angostura project is a high-sulphidation epithermal deposit. Based on the 2012 Preliminary Economic Assessment, it is expected to be mined by underground methods such as sub-level stoping with fill, bench & fill stoping, and cut &fill for 10 years. The ore will be recovered through a 6kt/d processing plant. In August, the Colombian National Mining Agency denied Eco Oro a 2-year extension of the exploration phase of its principal mining title because 50.73% of the principal existing concession falls within a preservation area (Santurbán Páramo).
Table of contents
- Summary
- Key issues
- Mining
- Processing
- CAPEX
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Springpole gold mine project
A detailed analysis of the Springpole gold mine project
$2,250
Asset Report
Donlin Creek gold mine project
A detailed analysis of the Donlin Creek gold mine project.
$2,250
Asset Report
Salares Norte gold mine project
A detailed analysis of the Salares Norte gold mine project
$2,250