Asset Report

Ann Mason copper mine project

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Mason project is based on open pit mining of the Mason copper - molybdenum porphyry deposit, with processing by conventional sulphide flotation. Products are expected to be copper and molybdenum concentrates, with copper production expected to average approximately 140 ktpa over the first 10 years of the 27-year mine life. This analysis is based on the results of the 2021 Preliminary Economic Assessment (PEA) released in April 2021 by Hudbay Minerals.

Table of contents

  • Summary
  • Key issues
  • Emissions
  • CAPEX
  • Mining
  • Process

Tables and charts

This report includes 2 images and tables including:

  • Ann Mason Emission Intensity Quartile ranking - total global production - tonnes Cu equivalent
  • Detailed map

What's included

This report contains:

  • Document

    Ann Mason copper mine project

    PDF 1.56 MB

  • Document

    Ann Mason copper mine project

    XLS 374.00 KB