In late-2003 construction started on a greenfield site, 27km North of Baoji, of a 100kt/a zinc-lead ISF smelter with a design capacity of 67kt/a zinc as SHG and 33kt/a refined lead. Commercial production commenced in June 2006. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Location / Transport
- Conc. Receipt / Storage
- Sinter Plant
- Acid Plant
- Smelting Furnace
- Refining
- Casting Plant
- Residue Disposal
- Other
Tables and charts
This report includes 6 images and tables including:
- Detailed map
- Flowsheet
- Sinter
- Smelting
- Refining
- Casting
What's included
This report contains:
Other reports you may be interested in
30 August 2022
Huludao (ISF) zinc smelter
Asset Report
Huludao (ISF) zinc smelter
A detailed analysis of the Huludao (ISF) zinc smelter.
$2,25027 May 2022
Hachinohe (ISF) zinc smelter
Asset Report
Hachinohe (ISF) zinc smelter
A detailed analysis of the Hachinohe (ISF) zinc smelter.
$2,25018 November 2022
Shaoguan (ISF) zinc smelter
Asset Report
Shaoguan (ISF) zinc smelter
A detailed analysis of the Shaoguan (ISF) zinc smelter.
$2,250