Asset Report

Baoji (ISF) zinc smelter

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

In late-2003 construction started on a greenfield site, 27km North of Baoji, of a 100kt/a zinc-lead ISF smelter with a design capacity of 67kt/a zinc as SHG and 33kt/a refined lead. Commercial production commenced in June 2006. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Emissions
  • Location / Transport
  • Conc. Receipt / Storage
  • Sinter Plant
  • Acid Plant
  • Smelting Furnace
  • Refining
  • Casting Plant
  • Residue Disposal
  • Other

Tables and charts

This report includes 7 images and tables including:

  • Baoji ISF Emission Intensity Quartile Ranking - total global production - tonnes Zn equivalent
  • Detailed map
  • Flowsheet
  • Sinter
  • Smelting
  • Refining
  • Casting

What's included

This report contains:

  • Document

    Baoji (ISF) zinc smelter

    PDF 1.68 MB

  • Document

    Baoji (ISF) zinc smelter

    ZIP 1.07 MB