Asset report

Huludao (ISF) zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

In 2001 the decsion was made to replace 60kt/a of the vertical retort capacity with an ISF smelter in 2004. This was a key state technical innovation project partly funded by national debt. The plant was designed by Changsha Engineering & Research Institute of Nonferrous Metals and Metallurgy and had a nominal capacity of 60kt/a zinc 30kt/a lead and 130kt/a sulphuric acid. Construction started in 2003 and the ISF was commissioned in July 2006.

What's included

This report contains

  • Document

    Huludao (ISF) zinc smelter

    PDF 628.99 KB

  • Document

    Huludao (ISF) zinc smelter.xls

    XLS 516.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Process overview
  • Products
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 3 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898