Asset Report
Bauxite Hills bauxite mine
Report summary
Bauxite Hills started as a single project but subsequently merged with the adjacent Skardon River project in late 2016. The project is geared for the export market and can supply both high temperature and low temperature ore, with the latter the favoured option. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Emissions
- Mining
- Process
Tables and charts
This report includes 2 images and tables including:
- Bauxite Hill Emission Intensity Quartile ranking – total global production - tonnes bauxite
- Detailed map
What's included
This report contains:
Other reports you may be interested in
07 February 2023
Mirai bauxite mine
Asset Report
Mirai bauxite mine
A detailed analysis of the Miraí bauxite mine.
$2,25006 January 2023
Baphlimali bauxite mine
Asset Report
Baphlimali bauxite mine
Hindalco's Baphlimali bauxite mine is the captive bauxite source of Utkal alumina refinery.
$2,25015 February 2021
Touissit (closed) zinc mine
Asset Report
Touissit (closed) zinc mine
A detailed analysis of the Touissit (Closed) zinc mine.
$2,250