Asset Report

Bolivar Sierra zinc mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Bolivar Sierra is an underground operation, utilising room-and-pillar and sub-level stoping methods. The Piedras Verdes processing plant is located 5km from the mine and adopts conventional flotation. Initially it had a processing capacity of 1,000t/d but in September 2013 a new circuit was installed, increasing the capacity to 2,000t/d. Towards the end of 2015 Sierra Metals was producing at a rate of approximately 2,500t/d and in 2016 throughput was averaged 2,800t/d through 2016. The Company are now taking the necessary steps to increase the daily throughput further to 3,000t/d and the objective is to reach 3,500t/d by year end 2017.

Table of contents

  • Summary
  • Key Issues
  • Emissions
  • Mining
  • Processing
  • Royalties and taxes

Tables and charts

This report includes 2 images and tables including:

  • Bolivar Sierra Emission Intensity Quartile ranking – Total global production - Tonnes Zn equivalent
  • Detailed map

What's included

This report contains:

  • Document

    Bolivar Sierra zinc mine

    XLS 399.50 KB

  • Document

    Bolivar Sierra zinc mine

    PDF 1.45 MB

  • Document

    Bolivar Sierra zinc mine

    ZIP 1.10 MB